Our Work

Photos from our jobs

These are photos from our own jobs. They show contents removal, board up, roof tarping, demolition, and drying work.

After a house fire: contents removal and demolition

Room with smoke blackened walls and ceiling, filled with piled clothing, bins, and household items, and a boarded window.
Before contents removalA room after a house fire, still full of fire damaged contents.
The room emptied of contents, with soot covered walls and ceiling and loose debris on the floor.
Contents removedThe same room with the contents out, ready for demolition.
The room stripped to bare wall framing, a block wall, exposed ceiling joists, and a plywood subfloor.
After demolitionThe same room taken down to the framing and subfloor, ready for the next phase.

Board up after a house fire

Three story brick rowhouse with broken windows on every floor and an open front doorway.
Before board upThe property after a fire and before our board up, with broken windows and an open front doorway.
The same brick rowhouse with plywood covering the windows on every floor and the front door.
After board upThe same property after our board up. The windows and front door are covered with plywood.
Corner house with fire damage around the upper bay window, with plywood covering the front door and the windows.
Another board upA second property, a corner house, boarded up after a fire. The door and windows are covered with plywood.

Emergency roof tarping

Blue tarp fastened with wood strips over a section of a slate roof, beside a charred section of roof and a chimney.
Roof tarpingA tarp fastened over a damaged section of roof to cover the opening.

Demolition and drying in progress

Basement room with the lower section of the walls removed to the studs and a bare concrete floor, with a blue air scrubber, a dehumidifier, and air movers connected by power cords.
Flood cut and drying in progressA water damage job with a flood cut along the lower walls. An air scrubber, a dehumidifier, and air movers are on site while the room dries.
Room with the ceiling open to the joists and wall sections open to the studs, with blue air movers running on the floor.
Demolition and drying in progressThe ceiling and sections of wall are opened up, and air movers are drying the room.
The same room from the opposite side, with a large blue machine in the foreground and air movers along the walls.
Drying in progressAnother view of the same room with our equipment running.
Hallway with the lower part of the walls removed and a bare floor, with a blue dehumidifier and air movers running.
Demolition and drying in progressLower wall sections are cut out along a hallway. A dehumidifier and air movers are drying the area.
Hallway with one wall opened to the studs, an opening in the ceiling, paper floor protection, and green air movers.
Demolition and drying in progressA wall and part of the ceiling are opened to the framing. Floor protection is down and air movers are running.
Room with the wall opened beside and above a large window, with a dehumidifier and two green air movers on floor protection.
Drying in progressWall material is removed beside and above a large window. A dehumidifier and two air movers are drying the area.
Wall opened to the framing beside a window, with a blue dehumidifier and three air movers on the floor.
Demolition and drying in progressA wall section is opened up around a window, with a dehumidifier and air movers set up on floor protection.
Kitchen with a section of flooring removed to expose the subfloor, with air movers and power cords on the floor.
Demolition and drying in progressA section of kitchen flooring is removed down to the subfloor, with air movers and a dehumidifier drying it.
Blue dehumidifier standing next to kitchen cabinets and plugged into a wall outlet.
Our equipmentOne of our dehumidifiers running in a kitchen.

Need help now?

Speak directly with our team, 24/7.

Call Now (267) 804-5004